Abstract

Incidences of holdouts, as group events, have appeared most frequently in many countries. The underlying cause of these occurrences of high frequency has been closely related to multiple objectives or various conflicts of interest of stakeholders. Each negotiation of holdout demolition represents a typical group consensus problem with the outcome greatly influenced by multiple objectives or variables of the decision makers. In order to effectively deal with such difficult problems, we construct a multivariate, minimum cost consensus model based on interval number programming constrained with random chances by jointly employing various approaches, such as minimum cost consensus model, multivariate planning, stochastic opportunity constrained programming and interval numbers. After the theoretical development, this paper employs the established method to solve the problem of holdout demolition of particular town A.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.