Abstract

With a comprehensive consideration of multiple product types, sequence-dependent setup time constraints and two different processing modes in wafer fabrication process, a scheduling model of multiple orders per job in a hybrid flow shop with an objective function of minimising total completion time of the system is developed. On the basis of the description, a new column generation algorithm based on a three-level (job-product-machine) disjunctive network flow is put forward. Furthermore, in order to improve degradation effects of the algorithm, a Lagrangian relaxation with sub-gradient optimisation is integrated into a frame of the column generation algorithm. Therefore, a modified column generation algorithm as a combination of Lagrangian approach and column generation algorithm is proposed. Finally, theory analysis and simulation experiments demonstrate that the presented algorithm is valid and feasible.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call