Abstract

This paper deals with the production planning and preventive maintenance scheduling on a single machine multi-product capacitated lot-sizing problem (CLSP). The machine is assumed to be subject to random failures. Preventive maintenances at the beginning of each production period to reduce the risk of failure and minimal repairs at failure is considered. The aim is to minimize the sum of the total production and maintenance costs related to inventory, backorder, production, set-up, preventive maintenance (PM), and minimal repair (MR) under demand satisfaction and machine capacities constraints over the entire horizon. Using the Weibull model, we present a mixed-integer linear programming (MIP) model to solve the problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.