Abstract

A mathematical model of a multi-product coal mining project is proposed to characterise the economics governing coal production. The model accounts for mining cost variation due to varying production levels, changes in reserves available for extraction by means of a cut-off parameter, as well as lead-time delays between investment and when operations begin. The resulting constrained optimisation problem is solved computationally by maximising the net present value of future cash flows from the mining operation subject to physical limitations. We find that the capital investment problem has greater bearing on the overall project configuration decision and that changes in production capital are made throughout the life of the project while production volumes are largely unchanged.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.