Abstract

A cut and fill earthworks management system was developed based on 4D CAD and earned value method. The system is composed of a schedule management system, 4D CAD system, cost estimation system, and earned value management system (EVMS). LandXML was employed as the product model to represent terrain data, and IFC was used to represent the process model. We applied the system to a past actual earthworks project and demonstrated that it could facilitate enhancing the control and management of cost and schedule of construction works as well as incorporating the progress payment method effectively.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.