Abstract
This paper deals with a buffer allocation problem in unpaced μ-unbalanced production line. Unpaced line is referred to a line with workstations act independently and the material is not pulled by demand but in push mode. In this study, the production line is considered unpaced, μ-unbalanced but reliable. Mean processing time (μ) is the most difficult variable to fix constant in an actual production line due to the complexity of assembly process. The unbalance variance will become higher if the assembly process is more complex. The optimal buffer allocation need to be found for this particular type of production line so that it can maximize throughput rate and minimize total number of work-in-progress (WIP) on the line. This paper used a simulation method to simulate the throughput rate by given sets of buffer size. Based on the simulation results, a basic optimal buffer allocation (OBA) concept represented the characteristics of OBA for a production line was summarized. By applying the concept, a development of 6 Steps OBA tool is carried out. This tool could be utilized by a management in allocating the buffer during designing of the line layout.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.