Abstract

Although economic production quantity, statistical process monitoring and maintenance are three major concepts in process optimization of industrial environments, they have been often investigated separately in literature. Furthermore, in studies that consider these three concepts simultaneously, it is assumed that there is only one assignable cause in the production process. This simplified assumption is unlikely to occur in real production processes due to the usual complexity of manufacturing systems, which may lead to a poor performance in both economic and statistical criteria if the assignable cause originating the shift is different from the one anticipated at the design of the chart. To overcome these drawbacks, this paper develops an integrated model ofeconomic production quantity, statistical process monitoring and maintenance in the presence ofmultiple assignable causes. The particle swarm optimization algorithm is used to minimize the expected total cost per production cycle, subject to statistical quality constraints. Also, a comparative study is performed to illustrate the effect of considering multiple assignable causes on model’s costs. Finally, a sensitivity analysis is conducted on the expected total cost per production cycle and process variable values to extend insights into the matter.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.