Abstract

In this paper, we propose a job-family-oriented algorithm to address the scheduling problem for re-entrant batch processing machine (RBPM) with incompatible job families and dynamic arrivals in the semiconductor wafer fabrication system (SWFS). In SWFS, at each time a RBPM is idle and available, the general algorithm first forms batches, then sequences these batches and finally assigns the super-batch to the idle RBPM. However, the job-family-oriented algorithm directly sequences the job families and assigns the jobs of super-family to the idle RBPM. With the rolling horizon control strategy, the job-family-oriented algorithm can update solution continually. Through comparing the two algorithms with some commonly used optimality criteria, the results demonstrate the effectiveness of our proposed algorithm.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.