Abstract

This paper focuses primarily on cyclic scheduling in multi-stage, multi-product production. Cyclic schedules are generalizations of common cycle schedules (CCSP) in which the cycle time for each product is required to be an integer multiple (not necessarily one as in the CCSP) of the base cycle time. Solution procedures which have been reported in literature for this problem ignore in-process inventory and are limited to single-stage and/or single-product production processes. After reviewing the literature, this paper presents an efficient heuristic procedure which generates near-optimal cyclic schedules for the multi-product, multi-stage flow shop production environment under deterministic and stationary conditions. This procedure accounts for all inventory costs including in-process inventory and idle time. The proposed solution is then compared to the optimal CCSP solution developed by El-Najdawi and Kleindorfer and, as expected, performed significantly better than the traditional CCSP approach. Compared to other heuristics studied in the literature, this procedure appears to be more useful as a computable and cost-efficient approach for practical size applications.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.