Abstract
The distributed scheduling problem has been considered as the allocation of a task to various machines in such a way that these machines are situated in different factories and these factories are geographically distributed. Therefore distributed scheduling has fulfilled various objectives, such as allocation of task to the factories and machines in such a manner that it can utilise the maximum resources. The objective of this paper is to minimise the makespan in each factory by considering the transportation time between the factories. In this paper, to address such a problem of scheduling in distributed manufacturing environment, a novel algorithm has been developed. The proposed algorithm gleans the ideas both from Tabu search and sample sort simulated annealing. A new algorithm known as hybrid Tabu sample-sort simulated annealing (HTSSA) has been developed and it has been tested on the numerical example. To reveal the supremacy of the proposed algorithm over simple SSA and Tabu search, more computational experiments have also been performed on 10 randomly generated datasets.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.