Abstract
Researchers have indicated that a permutation schedule can be improved by a non-permutation schedule in a flowshop with completion time-based criteria, such as makespan and total completion time. This study proposes a hybrid approach which draws on the advantages of simulated annealing and tabu search for the non-permutation flowshop scheduling problem, in which the objective function is the makespan of the schedule. To verify the effectiveness of the proposed hybrid approach, computational experiments are performed on a set of well-known non-permutation flowshop scheduling benchmark problems. The result shows that the performance of the hybrid approach is better than that of other approaches, including ant colony optimisation, simulated annealing, and tabu search. Further, the proposed approach found new upper bound values for all benchmark problems within a reasonable computational time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.