Abstract
The growth of plug-in electric vehicles (PEVs) in recent decades and their impact on the operation of distribution networks have necessitated the requirement for PEV parking lots (PEPLs). With respect to the development of technology advances, PEPLs can benefit from charging the PEVs and selling the discharge power of PEVs (with V2G ability) to the grid. Besides, the load growth, the aging of the components and their thermal limitations enforce the distribution network operator to de-energize some of the zones to lighten the peak load. This de-energization with day-ahead notification is accounted for as a planned outage (PO). Such outages can have an adverse effect on the PEPL’s daily revenue. This paper introduces a hybrid robust-stochastic model for optimal day-ahead scheduling of the PEPL with renewable generation and considering the inherent uncertainties. The proposed model of the day-ahead scheduling is subject to the PO notified by the distribution network operator and concerns profit maximization in a way that mitigates the power shortage problem in the PO period. This PO-oriented scheduling helps the owner of the PEPL to successfully provide service for the PEVs at a minimum cost.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.