Abstract

The project portfolio selection (PPS) problem consists of constructing a project portfolio, that is, a selection of projects scheduled over a period of time using various, potentially conflicting, criteria and resource constraints. The PPS is a well-known problem, recurrently occurring in several applications, with a rich history of approaches for modeling it and a large number of techniques for solving it. In this work we present a model for the PPS problem based on a real-world situation of selection and scheduling of projects in the power generation industry. We also propose a heuristic, based on the metaheuristic GRASP, to solve the problem, and assess its quality and performance through computational experiments. We describe the implementation of a decision support system prototype for the PPS problem that uses the proposed heuristic and includes several usability features that may help decision makers through the selection process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call