Abstract

On parallel and distributed heterogeneous computing systems, a heuristic-based task scheduling algorithm typically consists of two phases: task prioritization and processor selection. In a heuristic based task scheduling algorithm, different prioritization will produce different makespan on a heterogeneous computing system. Therefore, a good scheduling algorithm should be able to efficiently assign a priority to each subtask depending on the resources needed to minimize makespan. In this paper, a task scheduling scheme on heterogeneous computing systems using a multiple priority queues genetic algorithm (MPQGA) is proposed. The basic idea of our approach is to exploit the advantages of both evolutionary-based and heuristic-based algorithms while avoiding their drawbacks. The proposedalgorithm incorporates a genetic algorithm (GA) approach to assign a priority to each subtask while using a heuristic-based earliest finish time (EFT) approach to search for a solution for the task-to-processor mapping. The MPQGA method also designs crossover, mutation, and fitness function suitable for the scenario of directed acyclic graph (DAG) scheduling. The experimental results for large-sized problems from a large set of randomly generated graphs as well as graphs of real-world problems with various characteristics show that the proposed MPQGA algorithm outperforms two non-evolutionary heuristics and a random search method in terms of schedule quality.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.