Abstract

This article introduces a general single-machine setup times scheduling model with learning effect and deteriorating jobs simultaneously which is a generalisation of some existing models in the literature. The setup times are proportional to the length of the already processed jobs, i.e. the setup times are past-sequence-dependent (p-s-d). By the effects of learning and deterioration, we mean that the actual processing time of a job depends not only on the starting time of the job but also on its scheduled position. The article shows that the problems to minimise the makespan, sum of the kth power of completion times, total lateness and sum of earliness penalties (with common due date) are polynomially solvable under the proposed model. It further shows that the problems to minimise total weighted completion time, maximum lateness, maximum tardiness, total tardiness and total weighted earliness penalties (with common due date) are polynomially solvable under certain conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.