Abstract

Project selection has become crucial in the fields of science and engineering. This paper discusses the specific problem of selecting a portfolio of projects that achieves an organization's objectives without exceeding limited capital resources, especially when each project possesses vague input and output data in the selection. In this paper, a data envelopment analysis (DEA), knapsack formulation and fuzzy set theory integrated model is proposed to deal with the problem, and the model is demonstrated via a case study problem in engineering-procurement-construction (EPC) industry. Moreover, this paper applies three constraint handling techniques, which are factor-free penalty function based, to transform a constrained optimization problem into an unconstrained problem, and for the first time adopts the artificial bee colony (ABC) algorithm to search the solutions. The performances of these three constraint handling techniques with respect to the ABC algorithm are compared for the first time in this paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.