Abstract

Public Private Partnership (PPP) is widely used to bridge infrastructure projects in the world. PPP arises as a result of the ongoing budget constraints faced by various governments and part of the limited private sector opportunities in infrastructure development. In Indonesia, the implementation of PPP has not been successfully implemented. In 2017, 22 PPP projects were offered, but only 5 projects were signed. According to previous studies, there are some problems related to PPP implementation in Indonesia. Referring to this, PPP project success criteria are very important to be defined to assess the success of this type of project. Data collection procedure consists of preliminary survey involving experts in the field to verify the research attributes, followed by main survey to collect respondents’ perception regarding the attributes using Likert Scale. Importance Performance Analysis (IPA) is proposed to measure the performance of each success criterion in each respondent sector and followed by gap analysis to investigate critical gaps between them. The results of this paper are a methodological framework model that presents a gap implementation and a performance of the successful PPP criteria for toll road projects in Indonesia. These results can be used to assess the performance of PPPs in Indonesia.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.