Abstract

This paper considers the issue of lot-sizing and scheduling for multi-product production facilities using flexible flow lines. Flexible flow lines are also called flow lines with parallel machines at several or all stages of production with various products. The problem encountered in the company produce machine sparepart is a scheduling that is not optimal such as work rules that are not systematic causing a long of manufacturing time, but it also does not systematically result in scheduling a plan that is not optimal lot-sizing. In solving the problem, this paper proposes adjustments to scheduling planning and lot-sizing to improve the company performance. The objective of this study is to minimize processing time and production cost so as to satisfy customers. The expectation of the conceptual framework of the lot-sizing model and scheduling model is to be able to optimize lot-sizing and scheduling to achieve multi-objective goals of production time and production cost as a result of decisions related to many machine and lot size.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call