Abstract

PurposeStakeholders in complex capital projects are characterized by complicated interactions, adversarial short-term relationships and cooperative demand for deliverables. Unhealthy interfaces between stakeholders often lead to significant interface conflicts, which gradually become apparent in the construction stage. However, stakeholder interface health (SIH) has not been well understood and measured in the construction industry by either scholars or practitioners. It is essential to identify unhealthy interface relationships between stakeholders by comprehensively assessing SIH for enhancing project performance.Design/methodology/approachThe study provided a comprehensive framework to assess SIH. The assessment was based on Wuli-Shili-Renli theory. Moreover, the CRITIC and Grey-TOPSIS methodologies were applied to precisely evaluate the SIH level. Besides, graph-based interface networks were developed to visualize SIH. At last, the framework was applied to a mass rapid transit project in China to test the validity of the study.FindingsThe result showed that stakeholder interfaces with strict contract constraints are healthier. On the other hand, IM behaviors make up for the soft coordination mechanism without contract constraints to a certain extent. The results of the case study were consistent with the actual project practices. The proposed framework provided a useful IM tool for assessing and visualizing SIH.Research limitations/implicationsThe limitation of this study is that only the mass rapid transit project was selected for empirical analysis to validate the effectiveness of the proposed framework. It is recommended that the proposed framework be applied to other types of complex capital projects to further discussions in IM.Practical implicationsTheoretically, this study introduces a comprehensive framework to measure the health of stakeholder interfaces in complex capital projects, which helps to provide a theoretical basis and methodological support for stakeholder interface management.Social implicationsPractically, applying SIH assessment to existing interface management procedures can help the project manager identify interface conflicts between stakeholders in time and eventually contribute to the improvement of PM performance. At the same time, the interface management team tracks the responsibilities of unhealthy interface stakeholders and requires them to take measures to improve the SIH level. Stakeholder interfaces with lower health scores should be given more attention. The proposed framework can serve as a novel IM approach to identify weaknesses in IM and take targeted management measures to alleviate unhealthy stakeholder interface relationships.Originality/valueThe study provides an innovative method for scientifically and accurately assessing SIH. This research can help scholars and practitioners in the project management field facilitate the diagnosis of unhealthy interface relationships and provide decision support for the project management theoretical foundation.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.