Abstract

Abstract The aim of this paper was to compare the level of performance (success) of construction projects between selected countries based on the concept of iron triangle. Following this, the major construction delays, cost overruns and quality factors were identified through an in-depth review of previous research works conducted in Denmark, Nigeria and Gaza Strip. The aggregate impacts of these factors were computed and compared between these countries. The results show that in the case of Denmark, the aggregate impact of the factors responsible for delay, cost overrun and poor quality was found in the impact interval between [0.60–0.80], but in the case of Gaza Strip and Nigeria, the aggregate impacts were found in the impact interval between [0.80–1.0]. This shows that construction projects in Denmark are found to be performed better relative to Nigeria and Gaza Strip.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.