Abstract

A distributed decision making system for integrated optimization of production scheduling and distribution planning is proposed. The system consists of several subsystems that individually derive the solution of its own subproblem to minimize the objective function obtained by decomposing the problem using an augmented Lagrangian decomposition and coordination technique. The proposed approach is applied to planning and scheduling for an aluminum rolling processing line. Decision variables such as arrival date of raw materials, lot-sizing, production scheduling, and allocation of products to warehouses are optimized simultaneously by repeating local optimization in material resource planning, and scheduling subsystem for each production process and warehouse planning subsystem. The effectiveness of the proposed approach is demonstrated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.