Abstract

Prefabrication construction has gained attention in the construction industry. The cost of prefabrication has got mixed reviews. Cost management in prefabricated construction (CMPC) includes many cost considerations such as initial design costs, supply chain cost considerations, maintenance costs and assembly costs. These costs are inter-linked and thorough understanding on cost management is essential. It is important to develop a holistic cost management system to capture all the economic, social and environmental aspects of prefabricated construction. The aim of this research is to conduct as a critical review and analysis of cost management in prefabricated construction holistically. The literature review selected 63 articles for this research study from 2000 to 2022. The research showed that there is an uptake in research on this research area since 2005. The study identified four main research categories in CMPC namely 1) cost estimating, 2) cost optimization, 3) economic performance and 4) cost management models. Previous studies mostly focused on estimating costs and comparison studies with conventional construction. Recently studies focused more on developing cost model to integrate supply chains and other considerations into cost evaluation. Based on the literature review, there are several future directions in CMPC. Cost estimating should now focus on identifying the effect of each cost determinant in project scenarios to provide more accurate results. Future studies are also expected to focus on BIM and big-data based optimization models.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call