Abstract

This paper deals with a correlated storage location assignment problem by considering the production bill of material (BOM) information. Due to the large number of parts in a BOM, the picking capacity constraint is considered. A mathematical model is formulated and a multi-stage heuristic is proposed. The heuristic relaxes the close interrelationships within the original problem through an improvement algorithm and an iterated approach to incorporate the effect of BOM splitting. In order to evaluate the performance of the heuristic, numerical experimentation is conducted in a single-block-multi-aisles warehouse, by using a randomly generated data set.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.