Abstract
This paper presents novel corrective control actions to alleviate overloads in transmission lines by the Particle Swarm Optimization (PSO) method. Generator rescheduling and/or load shedding is performed locally, to restore the system from abnormal to normal operating state. The appropriate identification of generators and load buses to perform the corrective control action is an important task for the operators. Anew Direct Acyclic Graph (DAG) technique for selection of participating generators and buses with respect to a contingency is presented. The effectiveness of the proposed approach is demonstrated with the help of the IEEE 30 bus system. The result shows that the proposed approach is computationally fast, reliable and efficient, in restoring the system to normal state after a contingency with minimal control actions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.