Abstract
In order to overcome the problems of long response time and small number of manageable indicators existing in traditional construction project schedule management methods, a new construction schedule management method based on BIM model is designed in this paper. The construction progress data acquisition and decoding module circuit is set to complete the construction progress data acquisition, and the K-means algorithm is used to preprocess the construction progress data. First, the construction project progress is decomposed; then, the large-scale construction project is divided into different progress management levels by the WBS analysis method; a functional information module is established; the construction project progress data is imported into the BIM model; and finally, the BIM information function management of the method is realised. The experimental results show that the proposed method has low response time and multiple schedule management indicators, and the shortest response time of the proposed method is only 1.1 s.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.