Abstract

This work introduces a constraint programming (CP) model to minimise the makespan of a large scheduling problem in batch pharmaceutical manufacturing facilities. The model included campaign-manufacturing, sequence-dependent changeover, forbidden product-equipment assignment, non-working periods, limited renewable resources, finite intermediate/non-intermediate storage policies and preemptive and non-preemptive operations. The model was tested by scheduling two real examples. Each example consisted of two cases. Case A used the actual number of workers per shift. Case B involved reorganising the shift pattern of the workers. The results from the model were qualitatively validated and compared with the baseline schedules. The makespan of the first example decreased by 24.35% for case 1.A and 38.63% for case 1.B. The second example reported a 2.17% decrease in makespan for case 2.A and 16.67% decrease for case 2.B. This demonstrates the success of the proposed model as a simulation tool to identify the manufacturing bottlenecks by running what-if scenarios.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call