Abstract
This paper deals with the problem of scheduling jobs in a parallel flow shop environment without buffers between machines and with sequence-dependent setup times in order to minimize the maximum completion time of jobs. The blocking constraint normally leads to an increase in the maximum completion time of jobs due to the blockage of machines, which can increase even more so when setup times are considerable. Hence, the heuristic to solve this problem must take into account these specificities in order to minimize the timeout of machines. Because the procedures designed to solve the parallel flow shop scheduling problem must deal not only with the sequencing of jobs but also with their allocation to the flow shops, 36 heuristics have been tested in this paper, of which 35 combine sequencing rules with allocation methods while the last one takes a different approach that is more related to the nature of this problem. The computational evaluation of the implemented heuristics showed good performance of the heuristic designed especially for the problem (RCP0) when the setup times are considerable. Furthermore, the evaluation has also allowed us to propose a combined heuristic that leads to good solutions in a short CPU time.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Industrial Engineering Computations
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.