Abstract

This article provides a summary and assessment of well intervention activities, including perforation (add-perf/re-perf), acid treatment (acidizing), water/gas shut-off (WSO/GSO), hydraulic fracturing (HF), and electric submersible pump installation (ESP) at oil and gas production projects that the Petrovietnam Exploration and Production Corporation (PVEP) has participated in investment, operation, and optimization during the period of 2017 - 2021. Based on this, the effectiveness of well interventions in increasing production and reservoir recovery is evaluated. Additionally, the article analyzes lessons learned and proposes directions for optimizing well interventions for the next phase.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.