Abstract

It’s difficult to obtain and standardize the contractor capacity information during the process of the military equipment contractor evaluation. This paper analyzed 8 main influencing factors of contractor capacity and established a comprehensive evaluation model of military equipment contractor capacity based on grey target decision theory. Taking the military software production and development project as an example, the evaluation model was used to evaluate the capacity of five contractors, and the effectiveness of the model was verified. The evaluation model realized the comprehensive evaluation of the qualified influencing factors of the contractor capacity, and put forward an effective method to evaluate contractor capacity under the limited sample information situation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.