Abstract

Predictions by RELAP5/MOD2 and RETRAN-02 are compared on a model of the Westinghouse model E steam generator, which is a U-tube steam generator with an integral preheater section. Five transients are used as forcing functions to generate the response of the steam generator. These transients were selected based on providing both nominal and severe forcing functions on the heat removal capability of the secondary side. The steam generator transients investigated were a loss of feedwater, a turbine trip, a decrease in load demand, a increase in load demand, and a decrease in inlet feedwater temperature. Steam line exit mass flow rate, secondary-side liquid mass inventory and water level, and primary-side cold-leg temperature predictions are compared

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call