Abstract

In this paper the impacts of two types of repetitive scheduling systems on the makespan in a two‐stage hybrid flow shop, which consists of one machine in the first stage and multiple process lines in the second stage, are compared. First, we analyzed, through a simulation, how the makespan is affected by the setup frequency and sequencing rules for products under two types of scheduling systems: One is repetitive scheduling with only one batch per product family per scheduling cycle (basic cyclic scheduling system). The other is repetitive cyclic scheduling with various batches per product family per scheduling cycle (variable cyclic scheduling system). Second, we compared which scheduling system is superior under various manufacturing situations. The following points were noted. (1) The superior scheduling system can be shown by a two‐dimensional diagram of the setup frequency and the imbalance in workload for processing among process lines in the second stage. (2) Variable cyclic scheduling is superior in comparison with basic cyclic scheduling when there is a large imbalance in the workload to be processed among process lines in the second stage, or the workload in the second stage is larger than that in the first stage. The result of this research provides guidelines for selecting which scheduling system should be adopted.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.