Abstract

This paper deals with the problem of production scheduling in a two-stage hybrid flow shop, which consists of one machine in the first stage, and multiple process lines in the second stage. In the first stage, materials are batch-processed, which are then fed into one of several process lines in the second stage, depending on the final product specifications. First, we formulated the total flow time or makespan, the capacity utilization and the maximum work-in-process level as measures of manufacturing performance. We analysed, through a series of numerical experiments, how these performance measures are affected by lot sizing, sequencing rules and the scheduling scenario. The following points were clarified. (1) The ratio rule yields the best performance with regard to the makespan, but the LPT rule yields the best performance with regard to the maximum work-in-process level, (2) The optimum lot size is also affected by such operation conditions as the unit processing time, the setup time, and the ratio ...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.