Abstract
For deepwater developments, riser and mooring system requirements become a significant factor in the cost of the overall field development. Therefore, methods for reducing the riser and mooring design requirements and minimizing the cost of these systems become increasingly important. This paper presents the design methodology for a combined riser mooring (CRM) system and demonstrates the feasibility of the system for a test case application in a deepwater development offshore West of Africa. The CRM system offers significant benefits over the independent riser and mooring systems, namely reduced riser dynamics, reduced vessel offsets, a smaller seafloor footprint and system installation prior to the arrival of the FPSO.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Offshore Mechanics and Arctic Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.