Abstract

With the growing penetration rate of distributed generations (DGs) and large number of unordered charging electric vehicles (EVs), the distribution network (DN) is facing more challenges than before. Therefore, the DN planning integrated of EVs and DGs is the primely problem. Firstly, an traffic network model and a distributed power supply output model are established to simulate the actual traffic network flow distribution through the principle of user equilibrium flow distribution. Secondly, an improved adaptive free search algorithm is proposed to coordinate site selection planning of EV charging pile and DG considering the factors of economy and users’ satisfaction of charging. Finally, taking the modified IEEE 33-node distribution network as an example, the proposed model and algorithm are simulated and verified. The simulation results show that the proposed model and programming method are feasible and effective.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.