Abstract

This pbar note is to describe a recent checkout of the AP3, AP2, AP1 and P2 (F11 to F17) Beam Position Measurement (BPM) systems. The integrity of all BPMs (plates, cables, connectors and RF module) were performed. For each beam-line, the BPM positions polarity were checked: all of the horizontal (vertical) BPMs of a beam-line are to be consistent in defining left/right (up/down) by the sign of the position. The plates impedances have been measured. The position offsets at the output of the RF modules due to cable and connector differences were determined. Anytime an Energy Doubler BPM RF module (EE-107660) was found not working, a working spare was inserted; three AP2 RF modules were replaced. One connector for one of the cables of BPM728 was repaired. Two new cables were pulled and terminated for BPM716 since there was >8dB difference between the cables. In addition, three digitizer boards were replaced.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.