Abstract

Introduced a communication equipment room in Xi'an transition season application tubular I/DEC (Indirect and Direct Evaporative Cooling) projects. The analysis the several modes optimized air handling units throughout the year. Finally, according to the operation of the evaporative cooling air conditioning system in the transitional seasons concluded.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call