Abstract
We consider the one-machine scheduling problem with minimum and maximum time lags while minimizing the makespan. This problem typically arises in a manufacturing environment where the next job has to be carried out within a specific time range after the completion of the immediately preceding job. We describe a branch and bound algorithm, based on the input and output of a clique and the relevant propositions, for finding the optimal waiting times. The computational experiments give promising results, showing whether a given instance is feasible or infeasible. With the proposed branch and bound algorithm we can either find an optimal schedule or establish the infeasibility within an acceptable run time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.