Abstract

This article investigates how to simultaneously optimize both strategic and tactical decisions in the supply chain network design. For this purpose, a bi-level programming model is developed in which supply chain network design problem is considered as a strategic decision in the upper-level model, while the lower-level model contains the assembly line balancing as a tactical decision. In addition, the problem is extended to include push–pull strategy where decisions such as production amount and inventory level of each component in manufacturers are made. Based on the special structure of the model, a heuristic method is proposed to solve the developed bi-level model. A numerical example is employed to show the performance of proposed method in terms of feasibility and convergence. Finally, computational experiments on several problem instances are presented to demonstrate the applications of developed model and the solution method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.