Abstract

Conventionally, job processing times are assumed to be constant from the first job to be processed until the last job to be completed. However, recent empirical studies in several industries have verified that unit costs decline as firms produce more of a product and gain knowledge or experience. This phenomenon is known as the “learning effect.” In this paper a bicriteria m-identical parallel machine scheduling problem with a learning effect is considered. The objective function of the problem is to find a sequence that minimizes a weighted sum of total completion time and total tardiness. Total completion time and total tardiness are widely used performance measures in scheduling literature. To solve this scheduling problem, a mathematical programming model is formulated.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.