Abstract

A model of crack initiation and residual component life is fitted to the inspection history, inclusive of two in-service failures, of a set of gas circulator impellers at two UK power stations. The model is then used to estimate the probability of future in-service failure of each item in scenarios in which the next opportunity for inspection (i.e. detection of a developing crack) is exploited or forgone.The study takes into account in exact manner both variability and uncertainty. A novel Approximate Bayesian Computation (ABC) methodology is introduced for the quantification of uncertainty, i.e. the sampling of the posterior distribution of the parameters of the model. At the price of the discretization of this distribution, the methodology represents a quickly implemented option in problems where standard ABC rejection sampling is unacceptably inefficient.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call