Abstract

This paper describes a control algorithm for a battery energy storage system (BESS) to deliver a charge/discharge power output in response to changes in the grid frequency constrained by the National Grid Electricity Transmission (NGET)—the primary electricity transmission network operator in the U.K.—while managing the state of charge of the BESS to optimize the availability of the system. Furthermore, this paper investigates using the BESS in order to maximize triad avoidance benefit revenues while layering other services. Simulation using a 2 MW/1 MWh lithium–titanate BESS validated model is carried out to explore possible scenarios using the proposed algorithms. Finally, experimental results of the 2 MW/1 MWh Willenhall Energy Storage System verify the performance of the proposed algorithms.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.