Abstract
In cooperation between Siemens and MAN GHH an industrial gas turbine with an ISO rating of 9.2 5 MW was equipped with a dry low NOx combustion system. Using the hybrid burners of Siemens gas turbines, a new combustion chamber was developed for the gas turbine THM 1304 of MAN GHH. This gas turbine has two V-like arranged combustion chambers, which allow a redesign of the combustion chamber, without changing the remaining parts of the gas turbine and its casing. So it is possible as well, to fit present machines with new combustion chambers. The combustion chambers contain flame tubes of Siemens technology with ceramic tiles and the well proved hybrid burners. After calculation and design the air flow was examined in an isothermal flow model. Finally two prototypes of the combustion chamber mounted on a THM 1304 gas turbine were tested at the MAN GHH gas turbine test bed. Success came very quickly and the test runs are finished now. So for the first time the transfer of the well-known low emission values of the Siemens large scale gas turbines succeeded to an industrial gas turbine of the 10 MW class.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.