Abstract
Bored piles are constructed by drilling a hole, inserting a rebar cage, and grouting the hole. When the hole is augered, these piles are called augercast piles. See section: Augercast Piles in chapter: Pile Types for a complete description of the construction of augercast piles.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have