Abstract

Bored piles are constructed by drilling a hole, inserting a rebar cage, and grouting the hole. When the hole is augered, these piles are called augercast piles. See section: Augercast Piles in chapter: Pile Types for a complete description of the construction of augercast piles.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call