Abstract
AbstractThe National Geospatial‐Intelligence Agency (NGA) has implemented an integrated facilities' management program covering its many buildings, operations, and site locations. In conjunction with organizational structure development, a commercial‐off‐the‐shelf (COTS) computer aided facilities management (CAFM) system was implemented to integrate data collection and user control. These facilities' management aspects include tracking building floor space usage, employee locations, AutoCad building designs, equipment inventory, operations and maintenance scheduling, etc. The systems engineering process included a spiral architecture development model, initial and recurring data validations, a risk management review, and multiple phases of tracking requirements and change control. Formal configuration management boards (CMB) were a critical element of development and continuing operation of CAFM. Use of an open systems interface design to allow exchange of data between CAFM and related databases from Human Resources and Security Departments was essential. By replacing the many separate legacy facilities programs with an integrated CAFM package, more complete data information was collected which allowed for better control and operation of facilities resources and improved strategic facilities' planning.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.