Abstract

Based on the tunnel between Junfeng road-Xiliuzhuang of Qingdao metro, the tunnel excavation model is established by FLAC3D software. The established calculation model mainly includes:(1) Free field boundary conditions are adopted around and at the bottom of the model;(2) The blasting load is simulated by triangle pulse wave;(3) According to the peak value V of the surface velocity, the peak value Pmax of the velocity in the triangular pulse wave is calculated by Sadovsky formula;(4) The calculation results show that the vertical settlement of subgrade is more significant when compared with horizontal settlement;(5) the calculation results are in good agreement with the field monitoring data. It shows that the method can simulate the dynamic characteristics of the model and reflect the dynamic response of subgrade settlement.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call