Abstract
Variable speed motor-generators based on full size converter offer new options for operation of reversible pump-turbines. To explore the challenges related with this new technology a specific test rig configuration is developed to perform such transition with a PT reduced scale model. Transition from pump to turbine and vice versa are performed with various guide vanes opening and transition time. In order to extrapolate the results obtained at model scale to prototype, it is important to understand the system behaviour including the waterways and its influence on the flow in the pump-turbine. For this purpose, a 1D model of the test rig is realised. After validation with measurement results, the 1D model has been used to test the influence of the waterway on the pump-turbine transition.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.