Abstract

The pressure of the products of chemical reactions in the chamber of a rocket engine increases significantly if the rocket fuel components burn in the detonation mode. In this case, it can get to a simpler and more reliable expulsion propellant feed system instead of a turbopump feed system. The value of heat release power (MW / liter) of detonation engines is several orders of magnitude larger than that of aircraft and rocket engines operating in the Brighton cycle. The high rate of energy released in the detonation mode can significantly reduce the mass, the inertia, and overall dimensions of the propulsion system. Due to these features, detonation chambers are advisable to be used as part of ejector pulsed detonation engines, together with a turbine – in electric power generators of spacecraft, in a hybrid design – together with turbofan or turboprop engines, etc. In the article are considered various design schemes of pulse detonation engines (PDE): single-chamber and multi-chamber pulsed detonation engines; an ejector PDE system; a hybrid PDE and an integrated detonation-turbine unit with a detonation chamber in the form of a spiral and with a multi-chamber detonation device. The possibility of pulsation frequency increase is realized in the multi-chamber pulsed detonation engine, and the possibility of thrust size increase is realized in PDE with ejector. Replacing traditional chambers with detonation chambers in the construction of gas turbine jet engine will allow providing a decrease in propellant flow rate value from 8 % to 10 % on some estimations. In the hybrid detonation propulsion plant advantages inherent to the detonation cycle combine with positive features of a turbo-compressor jet engine. A combination of PDE and turbine allows creating the cogeneration propulsion system in that a turbine is used for the production of electric power, and detonation chamber – for the creation of thrust impulse. Practical realization of hybrid pulse detonation turbo-engine and the integrated detonation-turbine device is possible if two key complex problems will be solved. These problems are the detonation waves weakening on input in a turbine and the bearing and shaft necessary work resource increasing into a detonation pulsating stream

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.