Abstract

Objective: To create proposals on the system of maintenance for track facilities on the sections with ballastless constructions because the experience in maintaining of such structures is absent. Methods: During the study, the analysis of being predicted life cycle cost of track structure was made. This analysis is based on the study of indicators such as defectiveness of track superstructure elements (rails, fasteners, sleepers), the analysis of being estimated costs on repairing the track using expert evaluation methods. The expert assessment provides for the application of special correction factor. This factor for each maintenance job shows the ratio of job volumes on ballastless track to job volumes on ballast railway track. Results: On the basis of cost calculations and technologies for maintenance, an analysis was pursued of overhaul schemes for sections with ballast railway and for ones with ballastless construction and conclusions were made on required overhaul scheme for a ballastless track structure. Practical importance: The study results are intended to develop a system for planning technical maintenance and repairs of a ballastless superstructure track.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.