Abstract

A steady trend towards the development of electric power systems leads to their continuous enlargement and sophistication. As a result, new ways of their control appear. In this regard, the existing models and complexes for adequacy assessment may work inadequately and ineffectively in terms of the obtained results adequacy. To assess the current state of the existing models and complexes, we reviewed and analyzed the domestic and foreign software and computer systems. In particular, we considered mathematical models of minimizing the power shortage. This work is based on the problem of modifying mathematical models of minimizing the power shortage used in adequacy assessment of the electric power systems of one of the complexes under consideration. As a modification of mathematical models, it is proposed to exclude the existing method of using the line capacities and start use correct accounting for the maximum permissible active power flow in controlled sections. The experimental part reflected in the paper concerns the testing of options for models to minimize the power shortage, as well as the proposed modifications on various systems, including those consisting of three and seven reliability zones with a variable number of controlled sections and power lines included in them. The results of the study have shown that the proposed modifications are efficient and can be used in the future. The authors also obtained the most adequate results in terms of the physical laws of electric power system operation due to the model of minimizing the power shortage with quadratic losses which takes into account the limitations of power transmission over controlled sections.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call