Abstract

Modification of travel time is necessary in all Nakdong river basin because hydrological conditions of Nakdong river basin were changed after major rivers project. Also calculation of flood travel time at between sections of weirs is necessary. In this study, flood travel time was calculated using hydraulic model and the latest topographical data from Changnyeong-Haman weir to Nakdong river estuary bank. Analysis of discharge and stage conditions were carried out. 84 of the scenarios were organized according to flow rate, discharge type, boundary conditions, and tributary conditions. Flood travel time of initial and peak were calculated with discharge and stage conditions, respectively. The results of this study will be available in practical business work such as flood forecast warning and weir operation on algae removal.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.